The Explorer train to Armidale is to be replaced with a new train (R Sets) built in Spain by CAF. The trains are currently being tested prior to entering service.
The trains are bi mode powered. That is, they can be operated from overhead electric power from Central to Newcastle, and have a diesel engine to power the train from Newcastle to Armidale.
An option for the train was to be supplied with a battery pack to allow travel by diesel, overhead power or by battery. However, the Government did not order the battery packs. Our new trains will burn 3 to 4 litres of diesel per kilometre or about 1200 litres per trip. Had the new R sets been battery equipped, of the 578km journey 165 kms could have been electric, power, about 300kms on battery and only about 113kms on diesel. That would be a saving of about 860 litres of diesel or over $1000 per trip.
Got something on your mind? Go on then, engage. Submit your opinion piece, letter to the editor, or Quick Word now.
They will run on electricity from Broadmeadow Railway Station to Central Railway Station like the Sydney and the Intercity electric Train’s
Forward looking, isnt it?
Rick does know that the current achievable distance for battery power is less than 100kms? Batteries are also ineffective for speeds above 100km/h. Is he also aware of the size of the battery packs and the increased energy that would be required as a result of the weight of these packs?
Can we have a price for the batteries so an accurate price comparison can be made?